Current and planned temporary road closures

There are a variety of reasons why a road may need to be closed. This may include safety measures during roadworks, building repairs to a property or holding a community event. Whatever the reason, the road closure requires a legal order or notice and the procedures and requirements for closing a road must be strictly adhered to.

Below are current and planned temporary road closures for the week ahead. This list will be updated at the end of each week  *** Unplanned closures may not appear on the list straight away due to the nature of how we are informed of these ***

If you require any further information regarding a planned or unplanned closure please contact us at Network.Management@doncaster.gov.uk

Further information and details of diversion routes and other road works can also be found at https://one.network/tm

 

Address Locality Start Date End Date Licence Description
ASHTON LANE BRAITHWELL 15/07/2024 19/07/2024 works to rebuild stone building after vehicle damage
CHURCH STREET ARMTHORPE 28/07/2024 04/08/2024 Carriageway resurfacing works 16:30-23:00 - Sundays only
CLAY LANE WEST CLAY LANE 21/07/2024 21/07/2024 Sunday only 0800-1800 carriageway resurfacing
CORN HILL CONISBROUGH 22/07/2024 26/07/2024 Carriageway resurfacing works 08:00-18:00
COVENTRY GROVE WHEATLEY 29/07/2024 11/08/2024 works to Redesign the pedestrian refuge island
CROSS STREET BALBY 25/06/2024 05/08/2024 AZ5001001340070 Install a new gas main
DONCASTER ROAD TOLL BAR 01/06/2024 06/09/2024 Carriageway surface dressing & road markings 0700-1900
DONCASTER ROAD OWSTON 20/05/2024 02/08/2024 DQ015G-HWAY-00768460 carriageway surface dressing and subsequent road markings  Sundays 07:00-19:00
DONCASTER ROAD TOLL BAR 15/07/2024 19/07/2024 DQ015G-HWAY-00768456 Provision of urgent carriageway safety works between the hours of 19:00 – 06:00
DONCASTER ROAD OWSTON 15/07/2024 19/07/2024 DQ015G-HWAY-00768460 Provision of urgent carriageway safety works between the hours of 19:00 - 06:00
DORMER GREEN LANE OWSTON 20/07/2024 21/07/2024 Move rails to site and install 22.50 - 08.05
ELLISON STREET THORNE 01/07/2024 24/07/2024 Replace water mains  QB05843478817
FIELD ROAD THORNE 25/07/2024 30/09/2024 Water mains replacement  QB05848240012
FOOTPATH NO 25 TICKHILL TICKHILL 23/07/2024 24/07/2024 LB7012104-000013659013A  Works within sewage manhole cover
HALL LANE SOUTH BRAMWITH 22/07/2024 22/07/2024 BC008WFMH972R01  Lay new duct from Pole to Joint box 08:30-16:00
HIGH ROAD SERVICE ROAD BALBY 24/06/2024 02/08/2024 AZ5001001340082  Gas mains reinforcement
HIGH STREET BARNBY DUN 18/07/2024 24/07/2024 Emergency Gas works new supply  AZ7021001358392
HORSE FAIR GREEN THORNE 27/06/2024 11/08/2024 QB05852829923  Renew 4' Steel Main with new 125mm
IVANHOE WAY SPROTBROUGH 22/07/2024 26/07/2024 Resurface carriageway 08:00-18:00
KING EDWARD ROAD BALBY 22/07/2024 29/07/2024 DQ0026_24-25  S50 works to install a waste connection
KING EDWARD ROAD BALBY 30/07/2024 01/08/2024 New water supply  QB091281412640060
LEYS LANE HAMPOLE 22/07/2024 26/07/2024 Carriageway resurfacing   08:00-18:00
LORDS HEAD LANE WARMSWORTH 06/11/2023 06/11/2024 Install a temporary entrance to site and allow heavy plant to mobilise onsite and bulk material deliveries
MARCH GATE CONISBROUGH 21/07/2024 21/07/2024 DQ015G-HWAY-00797016 Sunday 0800-1800 Resurfacing carriageway
NEWARK ROAD MEXBOROUGH 22/07/2024 26/07/2024 Carriageway resurfacing  08:00 - 18:00
STAINFORTH ROAD BARNBY DUN 27/07/2024 28/07/2024 Annual Level Crossing Testing works  2300-0700
STATION ROAD ROSSINGTON 27/07/2024 28/07/2024 Drainage maintenance works 2345-0825
STORRS LANE OWSTON 29/07/2024 02/08/2024 Renewal of Rails through the crossing  2045-0540 Nightly
SYCAMORE ROAD MEXBOROUGH 22/07/2024 26/07/2024 Carriageway resurfacing  08:00 - 18:00
THORN LANE CLAY LANE 21/07/2024 21/07/2024 Sunday only 0800-1800 Carriageway resurfacing
WENTWORTH ROAD WHEATLEY 08/07/2024 16/08/2024 DQ015G-HWAY-00798383 Sundays only 08:00-18:00   JUNCTION REALIGNMENT TCF CYCLEWAY
WEST MOOR LINK EDENTHORPE 02/08/2024 05/10/2024 Construction of the new roundabout - closures are currently programmed for 2000-0600hrs on the following dates;   02.08.24, 30.08.24 and 30.09.24 to 05.10.24

 **Note:  Surface dressing and specialist surfacing closures take place on up to 5 separate occasions, with each occasion lasting no longer than 3 consecutive days. Works MAY occur on a weekend. This process is weather dependant and as such exact dates for each location cannot be given

 

 Highway Network Management

Current Roadworks

Last updated: 19 July 2024 14:39:24

Did you find this page helpful?