Current and planned temporary road closures

There are a variety of reasons why a road may need to be closed. This may include safety measures during roadworks, building repairs to a property or holding a community event. Whatever the reason, the road closure requires a legal order or notice and the procedures and requirements for closing a road must be strictly adhered to.

Below are current and planned temporary road closures for the week ahead. This list will be updated at the end of each week  *** Unplanned closures may not appear on the list straight away due to the nature of how we are informed of these ***

If you require any further information regarding a planned or unplanned closure please contact us at Network.Management@doncaster.gov.uk

Further information and details of diversion routes including other road works can also be found at https://one.network/tm

Street Locality Status Start Date End Date Activity Reference Description
Ashton Lane BRAITHWELL Proposed 01/08/2025 01/08/2025 TZ009ACTH-BRAM-111 Undertake test rod & rope & install sub duct into existing fibre infrastructure as part of the larger fibre to home scheme.  No excavation to be undertaken.
Austwood Lane BRAITHWELL Proposed 28/07/2025 31/07/2025 QB101288192260060 New Water Supply Connection - 5.2m x 10mm Carriageway, 1.5m x 6mm Footway
Barnby Dun Road CLAY LANE In Progress 13/07/2025 03/10/2025 DQ015S34 CLAY LANE ACTIVE TRAVEL WORKS
Barnstone Street Back Road East HEXTHORPE Proposed 06/06/2025 31/07/2025 DQ003SYS-BRBRE SCAFFOLD ACCESS TO EACH GABLE ON 1 BARNSTONE ST,DN4 0ES TO ALLOW THE ROOF WORKS AND EWI WORKS FOR WATES LTD WHO ARE CARRYING OUT ST LEGER HOMES UPGRADES 
Bentley Road BENTLEY Proposed 27/07/2025 27/07/2025 DQ015S127 CARRIAGEWAY RESURFACING - BENTLEY ROAD, BENTLEY
Bentley Road BENTLEY Proposed 27/07/2025 27/07/2025 DQ015S126 CARRIAGEWAY RESURFACING - BENTLEY ROAD, BENTLEY
Bramwith Lane BARNBY DUN In Progress 17/07/2025 23/07/2025 QB080289627300040 Repair leaking washout hydrant to water main
Bridleway No 14 Owston OWSTON In Progress 27/05/2025 15/08/2025 DQ015S41 BRIDLEWAY NO 14 OWSTON - PLANE AND RESURFACE PROW
Common Lane CLIFTON Proposed 31/07/2025 04/08/2025 TZ009BLO-MEX515-MEX498T Excavate to locate and repair damaged/blocked telecoms duct to enable provision of service/s to property/ies as part of larger fibre to the home scheme.
Doncaster Road HIGH MELTON Proposed 28/07/2025 29/08/2025 DQ015S69 DRAINAGE SCHEME 5 WEEK ROAD CLOSURE - W/C 28TH JULY
Edlington Lane EDLINGTON Proposed 28/07/2025 03/08/2025 DQ02028063 S278 New Pedestrian crossing point - new road surface under closure on the 3/8/25. 
Fairfield Road OFF YORK ROAD In Progress 02/06/2025 20/07/2025 DQ003FR-278 S278 - Reconstruction of a bell mouth into site, carriageway re-construction and footway remedials
Fenwick Common Lane FENWICK Proposed 22/07/2025 24/07/2025 TZ009BLO-ADW-WP3-115T Excavate to locate and repair damaged/blocked telecoms duct to enable provision of service/s to property/ies as part of larger fibre to the home scheme.
High Street BARNBY DUN In Progress 23/06/2025 12/09/2025 DQ015S66 TOP ROAD /  STATION ROAD / HIGH STREET BARNBY DUN - TRAFFIC SIGNAL SCHEME
High Street BENTLEY Proposed 27/07/2025 27/07/2025 DQ015S125 CARRIAGEWAY RESURFACING - HIGH STREET, BENTLEY
Joan Croft Lane HOLME Proposed 19/07/2025 20/07/2025 KL699THORPELX-190725 Road Traffic Light Relocation to support new level crossing upgrade. Working times 20:00 - 08:00
Kirton Lane THORNE Proposed 22/07/2025 23/07/2025 KL665NWR25-087-ECML ANNUAL MAINTENANCE. Working times 23:00 - 05:00
Long Gate WILSIC Proposed 26/07/2025 27/07/2025 DQ015S122 Drainage repairs full road closure on the bend from saturday the 26/072025  at 07.00 hours to the sunday the  27/07 2025  at 17:00 hours
Lords Head Lane WARMSWORTH In Progress 21/03/2025 19/12/2025 DQ02028006 HEAVY DUTY HGV WAGONS RUNNING THROUGHOUT THE DAY IMPORTING SPOIL TO THE GLEESON HOMES  RESIDENTIAL DEVELOPMENT.
Marshland Road MOORENDS Proposed 28/07/2025 29/07/2025 KL6642526WK18THORNEMOORE LEVEL CROSSING TEST. Working times 22:30 - 05:30
Mill Lane ADWICK LE STREET Proposed 28/07/2025 08/08/2025 QA222U19045487 New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 4 joint holes in footway and 20m trench in carriageway
Moorends Road MOORENDS Proposed 28/07/2025 29/07/2025 KL6642526WK18THORNEMOORA LEVEL CROSSING TEST. Working times 22:30 - 05:30
Moss Road ASKERN Proposed 24/07/2025 25/07/2025 KL665NWR25-085-ECML LEVEL CROSSING MAINTENANCE. Working times 23:00 - 05:00
Norton Common Road NORTON Proposed 23/07/2025 24/07/2025 KL665NWR25-088-ECML Level Crossing MAINTENANCE. Working times 23:00 - 05:00
Recreation Road WOODLANDS In Progress 18/07/2025 24/07/2025 QB080289785680040 Renew leaking water supply pipe
School Lane STAINTON Proposed 28/07/2025 01/08/2025 QA232U19050600 New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 2 joint holes and 3m trench in carriageway
Shaftholme Road ARKSEY Proposed 21/07/2025 22/07/2025 KL667ASHDIEBACK/161357 Urgent removal of declining Ash trees that pose a threat to the public and railway safety. Hours of works 22:00-06:00.  Pedestrian Marshalling in operation.  Permit for informational purposes only. Collaborative works with KL665NWR25-086-ECML
Shaftholme Road SHAFTHOLME Proposed 21/07/2025 22/07/2025 KL665NWR25-086-ECML Level crossing test. Working times 23:00 - 05:00
St Margarets Road Back Road BELLE VUE Proposed 22/07/2025 28/07/2025 QB20070282218-DM To excavate and repair 1m deep in carriageway to repair collapsed sewer
Stancil Lane TICKHILL In Progress 14/07/2025 19/07/2025 DQ015S182 JET PATCHING
Station Road ROSSINGTON Proposed 19/07/2025 20/07/2025 KL665NWR25-100-ECML RENEW RAILS. Working times 23:00 - 08:00
Station Road BARNBY DUN Proposed 21/07/2025 05/08/2025 DQ015S95 TOP ROAD /  STATION ROAD / HIGH STREET BARNBY DUN - TRAFFIC SIGNAL SCHEME
Station Road ASKERN Proposed 24/07/2025 25/07/2025 KL665NWR25-085-ECMLA LEVEL CROSSING MAINTENANCE. Working times 23:00 - 05:00
Station Road ROSSINGTON Proposed 01/08/2025 01/08/2025 KL665NWR25-131-ECML Using on track machinery to consolidate ballast to improve track quality on the down line. Hours of work 01:30 - 05:15.
Sunningdale Road Footpath BALBY In Progress 14/07/2025 25/07/2025 T60169688/5 Excavate and lay electric mains for the new development on Cross bank
Tickhill Way ROSSINGTON Proposed 23/07/2025 23/07/2025 LB7012104-000013924586 * *FC - DLO - REPAIR / REPLACE DEFECTIVE  MANHOLE FRAME AND COVERS
Top Road BARNBY DUN Proposed 21/07/2025 05/08/2025 DQ015S94 TOP ROAD /  STATION ROAD / HIGH STREET BARNBY DUN - TRAFFIC SIGNAL SCHEME
Wellingley Lane TICKHILL Proposed 19/07/2025 25/07/2025 DQ015S185 JET PATCHING
West Street THORNE Proposed 28/07/2025 01/08/2025 QB20070260549-JM To excavate and repair 2.4m deep in carriageway to repair collapsed sewer
West Street MEXBOROUGH Proposed 28/07/2025 01/08/2025 DQ00212A/25-26 150mm private foul water drain connection by junction onto 225mm combined sewer for Macelands Ltd


 **Note:  Surface dressing and specialist surfacing closures take place on up to 5 separate occasions, with each occasion lasting no longer than 3 consecutive days. Works MAY occur on a weekend. This process is weather dependant and as such exact dates for each location cannot be given

 