Employment Land Availability

This is an annual survey of the amount of allocated employment land in Doncaster.

It includes an assessment of its planning status and land that has been developed over the previous 12 months.

The date of the survey is 1 April. The survey report includes site information, a location plan and site plan. An analysis of the survey results is provided with comparison with previous surveys.

Updates are provided for each survey, this identifies any amendments on the information contained within the survey.

The documents produced for 2016 can be downloaded below. Documents for previous years are available via archive.

ELA 2017 Report
Download (852KB - PDF)
ELA 2017 - Sites Map
Download (2.36MB - PDF)

Contact

Last updated: 27 December 2017 10:12:45